Half Yearly Report and Accounts
Released
Released
Announcement PDF
LITHIUM AUSTRALIA NL
ACN 126 129 413
FINANCIAL REPORT
FOR THE HALF- YEAR ENDED 31 DECEMBER 2017
CONTENTS PAGE
CORPORATE DIRECTORY ................................................................................................ 1
DIRECTORS’ REPORT ....................................................................................................... 2
AUDITORS INDEPENDENCE DECLARATION ................................................................. 11
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE
INCOME ......................................................................................................................... 12
CONSOLIDATED STATEMENT OF FINANCIAL POSITION .............................................. 13
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY ............................................... 14
CONSOLIDATED STATEMENT OF CASH FLOWS ............................................................ 15
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS .......................................... 16
DIRECTORS’ DECLARATION .......................................................................................... 23
INDEPENDENT AUDITOR’S REPORT .............................................................................. 24
CORPORATE DIRECTORY
AUDITORS
DIRECTORS
Bentley’s Audit & Corporate (WA) Pty Ltd
Level 3
216 St Georges Terrace
Perth WA 6000
Adrian Griffin
Managing Director
George Bauk
Non-Executive Chairman
Bryan Dixon
Non-Executive Director
SHARE REGISTRY
Advanced Share Registry
110 Stirling Highway
Nedlands WA 6009
COMPANY SECRETARY
Barry Woodhouse
T: +61 8 9389 8033
F: +61 8 9262 3723
REGISTERED OFFICE
STOCK EXCHANGE
LISTING
Level 1
675 Murray Street
West Perth WA 6005
The Company is listed on Australian
Securities Exchange Limited
Home Exchange – Perth
ASX Codes: LIT and LITCE
T: +61 8 6145 0288
F: +61 8 9475 0847
E: info@lithium-au.com
W: www.lithium-au.com
Page 1
DIRECTORS’ REPORT
The Directors present their report on Lithium Australia NL (“LIT” or the “Company”) and its controlled entities
(the “Consolidated entity”) for the year half-year ended 31 December 2017.
BOARD OF DIRECTORS
The names and details of the Consolidated entity’s directors in office during the year and until the date of this
report are as follows. Directors were in office for this entire period unless otherwise stated.
Adrian Griffin
George Bauk
Bryan Dixon
Managing Director
Non-Executive Chairman
Non-Executive Director
COMPANY SECRETARY
Barry Woodhouse
RESULTS OF OPERATIONS
The operating loss after income tax of the Consolidated entity for the half-year ended 31 December 2017 was
$1,869,954 (31 December 2016: loss of $2,649,977).
No dividend has been paid during or is recommended for the financial period ended 31 December 2017.
FINANCIAL POSITION
The Consolidated entity’s working capital surplus, being current assets less current liabilities was $15,166,707
at 31 December 2017 (30 June 2017: working capital surplus of $2,726,613).
In the Directors’ opinion, there are reasonable grounds to believe that the Consolidated entity will be able to pay
its debts as and when they become due and payable.
REVIEW OF OPERATIONS
DEVELOPMENT STRATEGY
Lithium Australia NL (ASX: LIT) has advanced its goal of developing an integrated lithium company with the
capability of capitalising on all major sectors of the lithium supply chain, and in so doing closing the loop on the
lithium production cycle.
Page 2
Key elements of LIT's strategy include the following.
•
•
•
100% owned SiLeach® technology is capable of converting mine waste to lithium chemicals;
VSPC technology can convert lithium chemicals to superior lithium-ion battery cathode materials; and
Recycling technology will recover valuable metals from spent batteries, closing the loop on the energy
metal cycle.
LIT's technology development is supported by a growing resource base, which – coupled with its SiLeach® process
– can breathe new life into otherwise stranded assets. A prime example is the association of tin with lithium
mineralisation, as exemplified by the Sadisdorf deposit in Germany (see below).
Patent authorities have confirmed that SiLeach® is novel, inventive and has industry application. LIT has supported
a significant research and development programme to achieve this goal and is now packaging the funding
necessary to implement a large-scale pilot plant ('LSPP'). The latter, which is likely to be the world's first
hydrometallurgical facility for the production of lithium chemicals from silicates, will be fed by mine waste to
achieve the desired outcome.
LARGE-SCALE SILEACH® PILOT PLANT
Engineering design studies and financial modelling have shown that LIT’s proposed SiLeach® LSPP can produce
lithium chemicals from waste in the form of lithium micas on a competitive basis. Further, the studies have
identified multiple avenues for more substantial capital and operating-cost reductions – key findings released
during the quarter by LIT and CPC Project Design Pty Ltd. Design studies for the LSPP were based on annual
production of 2,500 tonnes of lithium carbonate equivalent (~1/10th the scale of a full-scale production plant).
At present, LIT’s preferred supply model is that of obtaining lithium mica from the waste streams (historical
dumps and tailings) of currently operating mines; that said, other supply opportunities are also being evaluated.
CATHODE MATERIALS FROM VSPC
LIT has acquired a controlling interest in the Very Small Particle Company Ltd (“VSPC”).
VSPC owns the following assets:
• Proprietary processes for the production of lithium-ion battery cathode materials;
•
A comprehensive pilot plant; and
•
Advanced laboratory and testing facilities.
The VSPC technology, which can be adapted to the production of a wide range of cathode materials, is a simple
and cost-effective means of producing such materials within an environment of superior quality control.
VSPC technology begins with cathode metals in a solution from which the cathode nanoparticles are precipitated.
The VSPC process is compatible with solutions produced during the processing of hard-rock minerals to recover
lithium carbonate or lithium hydroxide. Potentially, production of cathode materials direct from such solutions
removes two steps involved in the manufacture of cathode materials, resulting in a revolutionary process that
capitalises on the value-add generated by progressing from lithium chemicals to cathode materials. LIT is
currently investigating the seamless production of cathode materials from hard-rock minerals using
hydrometallurgical front-end processes, including both its own 100%-owned SiLeach® process and the LMax®
process of Lepidico Ltd, for which LIT has exclusive rights in Western Australia.
EXPLORATION ACTIVITIES
SADISDORF – GERMANY
Last year, LIT farmed into a joint venture ('JV') with Tin International AG (see ASX announcement 25 March 2017).
The style of mineralisation at Sadisdorf – an historic tin mine in Saxony, Germany, close to the border with the
Czech Republic – is a greisen (altered granite). The tin mineralisation is enveloped by a pervasive lithium-mica
alteration. Application of LIT's SiLeach® technology provides an opportunity to combine the value of the tin with
that of the lithium, the latter contained within minerals otherwise considered waste.
Page 3
Maiden lithium resource estimate completed
CSA Global, a leading international mining consultancy, has estimated an Inferred Mineral Resource at
Sadisdorf of 25 million tonnes grading 0.45% Li2O (see Table 1 below), based on re-analysis and reinterpretation of historical drilling and underground sampling there. Reporting was in accordance with JORC
2012 (ASX announcement 7 December 2017).
Classification
Domain
Tonnes (Mt)
Li (%)
Li2O (%)
Inferred
Inner greisen
17
0.22
0.47
Inferred
Outer greisen
8
0.20
0.43
Inferred
Total
25
0.21
0.45
Note: the Mineral Resource was estimated within constraining wireframe solids defined above (with
a nominal 0.15% Li cut-off). The Mineral Resource is reported from all blocks within these wireframe
solids. Differences may occur due to rounding.
Table 1. Inferred Mineral Resource estimate for Sadisdorf.
Resource modelling has confirmed that the dormant tin mine, which contains significant lithium mineralisation, can be
considered a polymetallic deposit with value contributions from lithium, tin and tungsten. Moreover, application of
SiLeach® has the potential to provide significant by-product credits (e.g. potassium sulphate fertiliser, sodium silicate).
LIT has begun drilling at Sadisdorf to improve resource definition and progress to a resource upgrade. A total of 460
m from two diamond core holes will duplicate selected historic drill holes, with large-diameter core (101 mm, SK6L)
facilitating collection of samples for future metallurgical testwork. A 3D view of the planned drilling is shown below.
3D view of holes planned for the JV’s maiden drilling programme.
LIT's Sadisdorf JV partner Tin International AG previously defined a JORC (2012) tin Inferred Mineral Resource of
3.36 Mt grading 0.44% Sn (at a cutoff of 0.25% Sn). Further exploration tenure has been granted to both Tin
International, and Lithium Australia subsequent to the end of the half year.
ELECTRA PROJECT – SONORA, MEXICO
LIT earned a 54% interest in the Electra lithium clay project (a JV with Infinite Lithium Corporation [previously
Alix Resources Corporation], AIX-TSX: V) during the December 2017 quarter.
A drilling programme at the Agua Fria prospect completed in the September 2017 quarter, identified a
prospective sedimentary sequence known as the 'West Flank' (see diagram below). This will be further
investigated, in order to identify the controls of higher-grade lithium values close to surface, where open-pit
mining can be undertaken with minimal waste stripping.
Page 4
Metallurgical testing of material from the Agua Fria drilling has established the following.
• Acid leaching at 50° C achieves 99% extraction of lithium in only four hours;
• No roasting is required; and
• No expensive reagents are required.
A large sample from Agua Fria has been delivered to Curtin University for further evaluation, with preliminary
results to be reported during the March 2018 quarter.
In addition to their significant lithium values, the clay horizons at Agua Fria are anomalous in potassium, which
may be recoverable as potassium sulphate, a major component of NPK fertilisers. There is, therefore, potential
for a valuable by-product credit to the project's economics.
Electra Project – West Flank: drilling and surface sampling location map.
Page 5
PILGANGOORA – WESTERN AUSTRALIA
LIT has a strategic alliance with Venus Metals Corporation (ASX: VMC). A field crew was despatched to undertake
ground reconnaissance, mapping and sampling on VMC’s Pilgangoora project in the Pilbara region of Western
Australia.
RAVENSTHORPE – WESTERN AUSTRALIA
Drilling of the Horseshoe Pegmatite within LIT’s 100%-owned Ravensthorpe project, located 420 km east of Perth
(see below), failed to define any economic lithium mineralisation. Costeaning completed on that pegmatite (ASX
release 26 May 2017) showed that both lepidolite and spodumene mineralisation were irregular, forming
discrete veins and pods. Further costeans are planned before any further drilling is undertaken at the Horseshoe
Pegmatite, in order to better quantify the nature of the mineralisation.
Location of LIT's Ravensthorpe lithium project.
Wet weather adversely affected drill-rig access and terminated the drilling campaign prematurely. Subsequent
heavy rains also delayed drilling planned for Deep Purple, a lepidolite pegmatite east of the Horseshoe
Pegmatite.
GASCOYNE – WESTERN AUSTRALIA
Geological reconnaissance and sampling has begun at LIT's 100%-owned Gascoyne project (see map below), 800
km north-northeast of Perth. The project, which lies along strike and adjacent to the Nardoo Pegmatite District,
is spatially associated with peraluminous S-type granites of the Thirty Three and Durlacher Supersuites. These
granites are interpreted to be the source of the pegmatites, as well as known lithium, rubidium, niobium,
tantalum, tungsten and tin occurrences in the region.
Page 6
Location of LIT's Gascoyne lithium project.
CAPE YORK – QUEENSLAND
LIT's 100%-owned Cape York project lies on the Cape York Peninsula in Queensland, 1,700 km northwest of
Brisbane (ASX release 26 July 2016). On 20 December 2016 Notice to Progress EPM26252 was received, with the
tenement granted on 19 January 2017.
Page 7
Location of LIT's Cape York project on the contact between the Holroyd Group and fertile granites.
COBALARK – WESTERN AUSTRALIA
LIT has applied for two exploration licences covering 355 km2 at its 100%-owned Cobalark project 670 km
northeast of Perth.
The tenements cover the Cobalark tantalum prospect and pegmatite outcrops along the Cobalark structural
trend (see below). Previous exploration recorded more pegmatite outcrops than those mapped by the Geological
Survey of Western Australia. Contact metamorphic effects within the host biotite adamellite suggest that
greisens have developed along some of the contacts. Tantalum occurs as fine, disseminated grains in both the
pegmatite and ferruginous capping rocks.
To date, no lithium exploration has occurred over any of the pegmatites in the project area.
Page 8
Location of LIT's Cobalark project.
OTHER OPPORTUNITIES
LIT is also exploring other opportunities in tantalum, tungsten, cobalt-manganese, graphite and rare-earth
metals, with a view to directing further exploration efforts on currently held ground and via potential acquisition
of quality Australian and overseas properties.
SUBSEQUENT EVENTS
(a) On 1 February 2018, the Company committed to the development of a Sileach® large-scale pilot plant. The
Company has approved the front-end engineering and design (FEED) and will procure long-lead equipment
in an effort to reduce the time frame through to commissioning and production, currently scheduled for
early 2021.
(b) On 13 February 2018 pursuant to the Controlled Placement Agreement, the Company issued 3,250,000 fully
paid ordinary shares at $0.20 per share.
(c)
On 13 February 2018, the Company issued 606,874 fully paid ordinary shares to suppliers and 1,091,365
fully paid ordinary shares under the Director & Senior Management Fee & Remuneration Sacrifice Share
Plan.
(d) On 27 February 2018, the Company executed a binding Share Sale and Purchase Agreement, including
lodgement of a transaction-specific prospectus with ASIC to facilitate the consideration payable for the
acquisition of 100% of the issued share capital of the Very Small Particle Company Ltd.
(e)
On 28 February 2018, the Company issued 61,133,540 fully paid ordinary shares at $0.16 per share and
30,566,770 partly paid shares at $0.028 per share, as consideration for the purchase of the Very Small
Particle Company Ltd. This constitutes a business combination under AASB 3. Given the timing of the
transaction, the identifiable fair value of the net assets acquired was unable to be determined.
Page 9
SUBSEQUENT EVENTS (continued)
(f)
On 1 March 2018, the Company secured $18,270,000 (face value $21,000,000) convertible note facility with
a leading institutional investor, Arena Investors LP. The notes are unsecured and will be drawn-down in six
separate tranches, each with a 12 month maturity, as follows:
- $3,045,000 (face value $3,500,000) to be received upon signing of the Convertible Note Deed and issued
under the Company’s existing placement capacity;
- $4,350,000 (face value $5,000,000) (subject to shareholder approval) for the Second Tranche which may
be drawn after shareholder approval which must be obtained within 45 days of the date of signing the
Convertible Note Deed; and
- $2,720,000 (face value $3,125,000) (subject to shareholder approval) for each of the remaining four
tranches, with a minimum of 4 months between drawdowns or such other time as permitted by the ASX
Listing Rules.
Other than as listed above, there have not been any other material events subsequent to the end of the reporting
date and the date of this report that have not been included in this financial report.
AUDITOR’S INDEPENDENCE DECLARATION
Section 307C of the Corporations Act 2001 requires our auditors, Bentleys, to provide the directors of the
Consolidated Entity with an Independence Declaration in relation to the review of the interim financial report.
This Independence Declaration is set out on page 11 and forms part of this directors’ report for the half-year
ended 31 December 2017.
This report is made in accordance with a resolution of the Directors.
Adrian Griffin
Managing Director
Dated at Perth this 14thday of March 2018
Competent Persons Statement:
The information contained in the report that relates to Exploration Results of projects owned by Lithium Australia NL and is
based on information compiled or reviewed by Mr. Adrian Griffin, who is an employee of the Company and is a Member of the
Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which is being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Griffin has given consent to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
Page 10
To the Board of Directors
Auditor’s Independence Declaration under Section 307C of the
Corporations Act 2001
As lead audit director for the review of the financial statements of Lithium Australia NL for
the period ended 31 December 2017, I declare that to the best of my knowledge and
belief, there have been no contraventions of:
the auditor independence requirements of the Corporations Act 2001 in relation to
the review; and
any applicable code of professional conduct in relation to the review.
Yours faithfully
BENTLEYS
Chartered Accountants
Dated at Perth this 14th day of March 2018
DOUG BELL CA
Director
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER
COMPREHENSIVE INCOME
For the Half-Year Ended 31 December 2017
Note
31 December
2017
31 December
2016
$
$
31,464
22,064
2,006,221
879,161
Continuing Operations
Revenue
Other Revenue
2
Occupancy costs
(36,726)
(44,726)
Professional fees
(437,588)
(155,120)
Corporate fees
Employee benefits expense
Administration costs
(336,802)
(387,180)
(1,530,643)
(883,674)
(394,587)
(180,285)
Fair value of investments adjustment
-
(40,040)
Realised gains on financial assets
-
96,905
Unrealised gains/(losses) on financial assets
Depreciation and amortisation
Exploration and evaluation costs written off
Profit/(Loss) before income tax
Income tax expense
Profit/(Loss) from continuing operations
-
(1,395,714)
(21,013)
(12,432)
(1,150,280)
(548,936)
(1,869,954)
(2,649,977)
-
-
(1,869,954)
(2,649,977)
3,602
-
4,876,472
(321,319)
3,010,120
(2,971,296)
(1,869,954)
(2,550,967)
-
(99,010)
(1,869,954)
(2,649,977)
3,010,120
(2,872,286)
-
(99,010)
3,010,120
(2,971,296)
(0.60)
(1.06)
Other comprehensive income
Items that may be reclassified subsequently to profit or loss:
Translation of foreign currency
Net fair value gain on available for sale financial assets
Total comprehensive income for the year
Profit/(Loss) for the year attributable to:
Members of the controlling entity
Non controlling interest
Total comprehensive income attributable to:
Members of the controlling entity
Non controlling interest
Basic Loss per share (cents per share)
The above statement of profit or loss and other comprehensive income should be read in conjunction with the accompanying notes.
Page 12
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
As at 31 December 2017
31 December
2017
30 June
2017
$
$
Cash and cash equivalents
15,664,937
2,586,506
Trade and other receivables
461,413
1,038,137
Note
Current Assets
Financial assets
Total Current Assets
751
-
16,127,101
3,624,643
Non Current Assets
Financial assets
3
3,554,883
5,631,545
Exploration Expenditure
4
2,865,858
2,977,849
Intangible assets
5
4,317,105
3,699,945
Property, plant and equipment
93,824
92,542
Total Non Current Assets
10,831,570
12,401,881
TOTAL ASSETS
26,958,771
16,026,524
Trade and other payables
960,394
898,030
Total Current Liabilities
960,394
898,030
TOTAL LIABILITIES
960,394
898,030
25,998,377
15,128,494
36,610,974
29,221,087
Current Liabilities
NET ASSETS
Equity
Issued capital
6
Reserves
7
3,625,280
2,198,280
Accumulated losses
(14,237,877)
(16,290,873)
TOTAL EQUITY
25,998,377
15,128,494
The above statement of financial position should be read in conjunction with the accompanying notes.
Page 13
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
For the Half-Year Ended 31 December 2017
Balance at 1 July 2016
Issued
Capital
Share Based
Payment
Reserve
$
$
Foreign
Currency
Translation
Reserve
$
Investment
Revaluation
Reserve
Accumulated
Losses
NonControlling
Interest
Total
$
$
$
$
20,936,454
691,225
(2,414)
125,980
(11,698,618)
-
10,052,627
-
-
-
-
(2,550,967)
(99,010)
(2,649,977)
-
-
-
(321,319)
-
-
(321,319)
-
-
-
(321,319)
(2,550,967)
(99,010)
(2,971,296)
4,449,799
-
-
-
-
-
4,449,799
-
-
-
-
-
4,150
4,150
(20,153)
-
-
-
-
-
(20,153)
105,000
(105,000)
-
-
-
-
-
-
262,433
-
-
-
-
262,433
25,471,100
848,658
(2,414)
(195,339)
(14,249,585)
(94,860)
11,777,560
Issued
Capital
Share Based
Payment
Reserve
Investment
Revaluation
Reserve
Accumulated
Losses
NonControlling
Interest
Total
$
$
Foreign
Currency
Translation
Reserve
$
$
$
$
$
29,221,087
1,085,918
(2,414)
1,114,776
(16,290,873)
-
15,128,494
-
-
-
-
(1,869,954)
-
(1,869,954)
-
-
3,602
-
-
-
3,602
-
-
-
4,876,472
-
-
4,876,472
-
-
3,602
4,876,472
(1,869,954)
-
3,010,120
8,163,837
(773,950)
-
-
-
-
-
8,163,837
(773,950)
-
469,876
-
-
-
-
469,876
-
-
-
(3,922,950)
3,922,950
-
-
36,610,974
1,555,794
1,188
2,068,298
(14,237,877)
-
25,998,377
Loss for the period
Other comprehensive income
Net fair value loss on available
for sale financial assets
Total comprehensive loss for
the period
Transaction with owner, directly recorded in equity:
Issue of shares
Non-controlling interest
arising on the incorporation of
subsidiary
Capital raising costs
Transfer from share-based
payments reserve
Issue of performance rights
and performance option rights
Balance at 31 December 2016
Balance at 1 July 2017
Profit for the period
Other comprehensive income
Translation of foreign currency
Net fair value loss on available
for sale financial assets
Total comprehensive loss for
the period
Transaction with owner,
directly recorded in equity:
Issue of shares
Capital raising costs
Movement in performance
rights
Transfer from investment
revaluation reserve on
disposal
Translation of foreign currency
Balance at 31 December 2017
The above statement of financial position should be read in conjunction with the accompanying notes.
Page 14
CONSOLIDATED STATEMENT OF CASH FLOWS
For the Half-Year Ended 31 December 2017
31 December 2017
31 December 2016
$
$
Payments to suppliers and employees
(1,802,789)
(1,418,485)
Payments for exploration and evaluation
(1,010,251)
(598,633)
Proceeds from R&D tax rebate
2,391,036
159,161
31,464
22,064
(390,540)
(1,835,893)
Purchase of property, plant and equipment
(32,500)
(66,281)
Payment for intangible assets
(536,757)
(1,227,376)
Proceeds from the sale of other financial assets
7,190,236
-
Payment for other financial assets
(101,418)
(161,306)
-
(480)
6,519,561
(1,455,443)
6,949,410
3,625,211
-
(13,903)
Net cash generated by financing activities
6,949,410
3,611,308
Net increase in cash held
13,078,431
319,972
Cash and cash equivalents at the beginning of the period
2,586,506
5,756,645
Cash and cash equivalents at the end of the period
15,664,937
6,076,617
Note
Cash Flows from Operating Activities
Interest received
Net cash used in operating activities
Cash Flows from Investing Activities
Payments for investment assets
Net cash used in investing activities
Cash Flows from Financing Activities
Proceeds from issue of shares
Payment for capital raising costs
The above statement of cash flows should be read in conjunction with the accompanying notes.
Page 15
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half-year ended 31 December 2017
These consolidated financial statements and notes represent those of Lithium Australia NL and its controlled entity (the “Consolidated
entity”). Australia NL is a no liability company, incorporated and domiciled in Australia.
The Consolidated entity is a for-profit entity for financial reporting purposes under Australian Accounting Standards. The financial
statements for the period ended 31 December 2017 were approved and authorised for issue by the Board of Directors on 14 March
2018.
1.
STATEMENT OF SIGNIFICANT ACCOUNTING POLICIES
The following is a summary of the material accounting policies adopted by the Consolidated entity in the preparation of the
financial report. The accounting policies have been consistently applied, unless otherwise stated.
Basis of Preparation
The half-year financial report is a general-purpose financial statement, which has been prepared in accordance with the
requirements of the Corporations Act 2001, applicable Accounting Standards including AASB 134 “Interim Financial Reporting”
and other mandatory professional reporting requirements. Compliance with Australian Accounting Standards ensures that the
financial statements and notes also comply with International Financial Reporting Standards.
The half-year financial report has been prepared on a historical cost basis, except where applicable for financial assets that
have been measured at fair value. Cost is based on the fair value of the consideration given in exchange for assets. The
company is domiciled in Australia and all amounts are presented in Australian dollars, unless otherwise noted. For the purpose
of preparing the half-year financial report, the half-year has been treated as a discrete reporting period.
The half year financial report does not include all notes of the type normally included within the annual financial report and
therefore cannot be expected to provide as full an understanding of the financial performance, financial position and financing
and investing activities of the consolidated entity as the full financial report.
It is recommended that this financial report be read in conjunction with the annual financial report of Lithium Australia NL as
at 30 June 2017 and any public announcements made by the Consolidated Entity during the half-year in accordance with
continuous disclosure requirements arising under the Corporations Act 2001 and the ASX Listing Rules.
The half-year financial statements have been prepared in accordance with the accounting policies adopted in the consolidated
entity’s last annual financial statements for the year ended 30 June 2017.
The Consolidated Entity has adopted all of the new and revised Standards and Interpretations issued by the Australian
Accounting Standards Board (AASB) that are relevant to their operations and effective for the current half year.
2.
OTHER REVENUE
Sale of Tenements
R&D Rebate
Administration Fee
3.
FINANCIAL ASSETS
Non-current
Available for sale Australian listed shares – Level 1 fair value
Available for sale Canadian listed shares – Level 1 fair value
Page 16
2017
2016
$
200,000
1,790,380
15,841
2,006,221
$
720,000
159,161
879,161
31-Dec-17
$
30-June-17
$
2,994,883
560,000
3,554,883
5,531,545
100,000
5,631,545
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half-year ended 31 December 2017 (continued)
3.
FINANCIAL ASSETS (continued)
Reconciliation of financial assets:
31-Dec-17
$
5,631,545
298,000
(4,377,879)
2,003,217
3,554,883
Opening balance
Purchases
Disposals (written down value) (i)
Revaluation increase/(decrease) through financial asset reserve
Closing balance
30-June-17
$
288,496
4,370,842
(26,589)
998,796
5,631,545
(i) The Group received proceeds of $7,253,800 from the disposal of shares in listed entities, resulting in a realised gain of
$2,873,255 recognised in other comprehensive income in accordance with the Group’s accounting policy.
4.
CAPITALISED EXPLORATION EXPENDITURE
Opening balance
Additions:
Interest in Tin International
Greenbushes Acquisition
Lithium Rights at Lake Johnston
Interest in Rights of Buckland
Interest in Electra
Lithophile
Impairment of Buckland
Closing balance
5.
INTANGIBLE ASSETS
Opening balance
Transfer from other assets
Expenditure during the period (i)
Less: Amortisation of intangible
asset
Closing balance
31-Dec-17
Patents Development
Costs
$
$
96,600
3,603,345
619,260
(2,100)
94,500
4,222,605
31-Dec-17
$
2,977,849
30-June-17
$
147,050
(111,991)
2,865,858
372,792
102,090
1,743,750
111,991
306,009
194,167
2,977,849
$
3,699,945
619,260
(2,100)
30-Jun-17
Patents Development
Costs
$
$
100,800
602,318
3,001,027
(4,200)
-
$
703,118
3,001,027
(4,200)
4,317,105
96,600
3,699,945
Total
3,603,345
Total
(i) During the period, the company spent $619,260 on development costs relating to the new lithium technology.
(ii) LIT has focused on the development of process technology that may have the ability to transform previously under
developed lithium mineral occurrences into valuable ore. The Company has assessed a number of process flow sheets
at a laboratory bench scale level and selected the Sileach® technology for pilot plant testing. The Sileach® process is
effect